FREE WEBINAR

2026/06/10(Wed)

Fundamentals of Electrical Safety Testing

Register

How do I set up the PAT-T master-slave parallel operation system?

a) Connect the optional parallel operation power cable (PC01-PAT).
b) Connect PAT-Ts in parallel with the output cables.
c) Go to CF26 of the CONFIG setting to set the master or slave unit.
d) Go to CF24 of the CONFIG setting to set the total number of the master and slave units.
For the details, read the user’s manual -chapter Parallel/Series Operation -Master-Slave Parallel Operation.

FREE WEBINAR Fundamentals of Electrical Safety Testing webinar

2026/06/10(Wed)

Fundamentals of Electrical Safety Testing

A Thorough Explanation of Hipot, IR, Ground Bond, and
Leakage Current Testing

Register